|
I started with an existing slab.
|
First, the sill is bolted to the slab.
|
|
You can see the door will be on the other side.
|
Wall, window and door framing is done.
|
|
The gable ends and ridge rafter are in place.
|
Roof framing is done.
|
|
With siding and eve vents.
|
With roof sheeting and skylights.
|
|
With corner, gable and facia trim on and primed.
|
This siding comes pre-primed. Now it's painted, too.
|
|
Gable and facia trim painted and roof felt on.
|
Asphalt shingles matching the home are on.
|
|
Vinyl windows are installed.
|
And with window trim. Now for the door.
|
All that's left are the rain gutters and downspouts.
|
I built storage lofts in each end...very handy to have.
|
|

STEVE MILLER Owner / Laborer Licensed,
Bonded, Insured 360-258-6383
|
The best choice to call when you want:
- Hand thinned & shaped shrubs, hedges &
trees
- Lawn maintenance including cut new edges; bark; aerate; dethatch; feed; treat pH & clay; insect, disease,
& weed control
- Roof, concrete, deck & fence cleaning and treatment
- Retaining walls, fences, sheds
& decks built
- Over-seeding and lawns installed
- Sprinkler systems designed, installed and maintained
|
|